1 · Campus · halls & specs
Choose campus IT capacity · halls = capacity ÷ your Build hall (IT MW) · diagram 3 is still one module.
Facility program
-
Live floor · driven by Build
Live-
Rack section
Utility → rack paths
-
Scale · complete hall
-
Mirrors your Build stack · change blocks, GPU mix, or add-ons on Build and this view updates. Campus hall split, site plan, and isometric hall; layer toggles and rack detail apply to the hall diagram.
Campus halls · site plan · hall isometric · layer toggles on hall
LiveChoose campus IT capacity · halls = capacity ÷ your Build hall (IT MW) · diagram 3 is still one module.
Ring road, parking, substation, plant · up to 12 hall footprints (A–L) · full hall count on diagram 1.
White-space layout · busway, CHW, fabric. Toggle a layer off to see illustrative impact on the hall; click a rack for detail.
Layer off · illustrative impact
-
| Layer | Power | Cooling | Network | Space |
|---|
Layer name → focus block on Build.
Hops & cables below · switch counts & Gbps in the matrix Network column above.
Operate · after energize
-
Steady-state ops after energize: what to watch in EPMS, DCIM, BMS, and NOC, aligned to Program and Scale. Pre-commission and DD checklists stay on Program (Commission checklist, Open before DD).
Mini panels animate with the load-test playground above (same sim · distinct shapes per signal).
Row → focus that stack layer on Build. Trace column = illustrative watch signals (same sim as above).
| Layer | Watch | Trace | Usual failure |
|---|